34 Ton XCMG Excavator XE345C

Home>Crawler Excavator> Crawler Excavator > Crawler Excavator

34 Ton XCMG Excavator XE345C

The impooed criginal ISUZU engine has a strong power, which can meet high efficient operational requirements...

34 Ton XCMG Excavator XE345C

XE345C hydraulic excavator

Forceful Power, Create Efficiency

The impooed criginal ISUZU engine has a strong power, which can meet high efficient operational requirements;


The exact matching design coupled with advanced energy-savilg control make the machine has less fuel consumption:

The machine has low emissions, which meets Europe II standard;

The new cooling fan and large-scale adoption of silencer, so that the noise is Reduced;


The advanced tuobocharger technology is used to enhance the adaptation of the machine on highland:

The automatic preheating system can improve the working ability of the machine in low temperature.

The re-start preventing system can avoid mistake operation and improve the safety of the machile.

Unique hopper opening type fan hood connecting with the engine.improve the ability of radiatilg, makes sure the machine can be continuous work effectively.


Advanced Hydraulic System

The high-end configurations: hydraulic pump, main valve, rctary motor. travel motor. cylinder, pilot control valve and other components are used international renowned brands, ensured the product quality;

The iltegrated latest research results can reduce energy consumption, faster response and higher efficiency;

The locked function of the boom, ann: to prevent the boom and arm . sinking, toextend its time il the medium position;

The arm back oil regeneration: the arm should be moved back fast and stable;

Strong and precise rotary control: has inproved the absorbtion charac­teristics of the vibration, to ensure the stop action of rotation more aocurate and smooth by increasing the tcrque reserve. giving the machine more robust rotation ability.

The cylinder has a buffering function: the boom cy1ilder and arm cylinder are designed with the buffer. which can reduce the machine vibration and shock, reduce noise and prolong tank life:

Double-pump and convergence technology: this can increase the flow that the main valve supplies to the boom, the arm cylinder increase operating speed;

The hydraulic clamping device is set on the walking pilot valve: this can make machine more smooth when it runs and stops.


Strengthened work installation

Standard enhanced boom: The boom is used with large cross-secnon. high-ngidity box-shaped structure. through optimizilg procession. to reduce the negative intensity weldilg site, to meet the construction requirements of heavy -load operations; The inportant hinged parts are all forgings structure, to prevent improv­ng the strength at the same time of focusing the stress. The strengthen design of the boom root, to enlarge the sleeve and ilcrease the thickness of the plate to ease the stress improving durability.


The arm: The forging structure is used at the important hinging parts, through changing the shape and thickness of the hingilg parts, through changing the shape and thickness of the plate for easing the stress and improving durability. (Optional long bucket rod or short arm )


The bushing: The connecting parts of the boom and the arm pin, the high strength wear-resistance bush is used and can be used for a long time.


Strengthened bucket of anti-friction

To increase the wear resistance performance of the bucket: The bucket cuttilg boards are made of special wear-re­sistant steel plate, which is suitable for heavy operational require­ments. coupled with wear-resistant-type bucket teeth.side teeth, to improve the use performance of the machine.

The thickness increased steel board and ilcrease the side strengthens board to improve wear resistance performance;

The flat-bottomed bucket is used to carry out smooth operations: the trimming surlace is tidy flat.

Strengthened the intensity of chassis frame.

To strengthen the X-frame: To improve the design of crawler frame cross-sectional shape, so that the soil aroundthe track frame is less likely to pile up, the track canying wheel is more difficult to wear, to inprove the durability and dependability of the machine.

To increase the size of the box-shaped structure in X-frame, unprove the performance of section. so that the machine is more able to adapt to heavy-duty operational requirements.


Counterweight is tncreased

The increasing counterweight: To in-crease the quality of weight: it has been improved compared with the same level of models, the machine has better stability.


FAQ:

Q: Dose the eougem machine has good service?

A: Yes,of course .we have a professional sale and after-sales service team.we require all the personnel of the service must be within 24 back to all customer inquiries.


Q: How long is your delivery time?

A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.


Q: What is your terms of payment?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shipment. If you have another question, please free to contact us as below.



Hot Tags: 34 ton xcmg excavator xe345c, China, manufacturers, brands, low price, for sale
Related Products